ranade-oss puts Delivery C behind launch controls
A small production-readiness merge treats release controls as part of the product delivery, not an afterthought.
The available record is brief, but the direction is clear: ranade-oss has merged work to prepare Delivery C for launch and to add controls around that transition.
That matters because it joins two jobs that are often separated in legal-tech projects. The delivery itself is being readied for production while the team also puts guardrails around taking it live. The change went straight to the main branch shortly after opening, which suggests this was a focused readiness decision rather than a long-running redesign.
GitHub is the place to inspect what those controls cover and how much of the broader production work is already in place.
Spotted something wrong? Or know the PR text has fresher detail than the writeup above?